Projects

Award Winning Timber Frame Extension and Renovation – Sandycove:

 
“Mick Deevy comes in for high praise” The Irish Times

Winner of the Prestigious OPUS Architecture and Construction Awards 2006, with Derek Tynan Architects DTA.

 

What We Did:

       

Project Facts:

 
Architects:
Derek Tynan Architects.
Duration:
7 Months
           
 

Steel Frame Extension and Renovation- Terenure:

 
“Both client and Architect have great praise for Deevy, 'he wouldn’t point out a problem until he had worked out a solution…'” Peter Cully
 

What We Did:

 
  • Steel frame extension with Zinc roof.
  • Steel framed garden room with Zinc Roof.
  • Modernisation of existing house.
  • Large Garage and Workshop.
  • Courtyard Landscaping.  

Project Facts:

 
Architect:
Peter Cully.
Duration: 
5 Months.
Planting: 
Janie Lazar, Design Classics Direct
 
   
 

Extension and Renovation – Donnybrook Dublin 4:

What We Did:

  • Major Refurbishment work.
  • Conversion of traditional Victorian two up, two down into modern open plan
  • Extension- Kitchen and living room.  

Project Facts:

 
Architect:
Deidre Hartigan.
Duration:
4 Months.
 
   
 

Single storey  Extension – Balinteer:

What We Did:

  • Extended Kitchen / Dining room by approx 25msq.
  • Removed rear wall of house and supported above with steel.
  • Removed concrete floors and reinstated with under floor heating and screed.
  • Granite tilling.
  • Landscaping.  

Project Facts:

Design:  
Mick Deevy
Engineers:
Frank Madden (Lohen And Donnelley)